Post and Footing Concrete Calculator: How Many Bags for Your Holes
Concrete bags and gravel for post holes and footings for fences, decks, pergolas and gazebos. Set hole size and depth, get a buy list and a drawing.
The tool failed to load. Please reload the page.
Report a problem
Nothing is sent until you press Send.
When to use this
- You have worked out how many posts or footings you need and want the number of concrete bags.
- You want the bag count to follow the hole size, depth and the post that sits in it, not a rule of thumb per post.
- You want the gravel for the bottom of the holes and one buy list that adds up with your fence or deck.
How to use
- If you used the fence or deck tool on this site in this browser, press the Import chip at the top to fill in the number of holes and sizes.
- Otherwise type the number of holes, the post size, the hole diameter and the hole depth.
- Choose your bag size, or type the yield printed on your bag.
- Press Calculate concrete. Read the bags to buy and check the drawing.
- Add the result to your project plan so the stain tool and the combined buy list can use it.
Examples
- 16 fence posts, 4x4, 10 in holes: 16 holes, 3.5 in post, 10 in wide, 36 in deep, 4 in of gravel, 60 lb bags (0.45 ft³ each), 5 percent spare: 46 bags of concrete and about 3 ft³ of gravel.
- Deck footings with tubes: 6 holes, 5.5 in post, 12 in wide, 42 in deep. Import the deck plan for the hole count and type the rest.
- Check against a bag's own example: Quikrete's data sheet says two 50 lb bags of its fast-setting mix set a 3 in square post in a 9 in hole 30 in deep, filled to 3 to 4 in below the top. With 1 hole, a 3 in post, 9 in x 30 in, no gravel, concrete stopping 3.5 in below the top, 0.375 ft³ per bag and no spare, the tool gets 0.84 ft³, or 2.23 bags, and rounds up to 3. Real holes vary, which is why the spare is there.
- 10 fence posts, 4x4, holes three times the post width: 10 holes, 3.5 in post, 10.5 in wide, 36 in deep, 6 in of gravel, concrete stopping 3.5 in below ground, 50 lb fast-setting bags (0.375 ft³), 5 percent spare: about 3 bags per hole, 32 bags in all, and about 3 ft³ of gravel.
How it works
Concrete per hole = (pi x (hole diameter / 2)² - post width²) x concrete depth, where the concrete depth is the hole depth minus the gravel and minus the gap you leave at the top. That is multiplied by the number of holes and by 1 + your spare, divided by the bag yield and rounded up to whole bags. Gravel = pi x (hole diameter / 2)² x gravel depth for each hole.
Checked against:
- Hole about 3 times the post width, 6 in of gravel, concrete to 3 to 4 in below ground, depth 1/3 to 1/2 of the above-ground post length plus 6 in: Quikrete, Setting Posts in Concrete (quikrete.com/athome/settingposts.asp), checked 2026-11-03.
- Bag yields (50 lb = 0.375 ft³, 60 lb = 0.45 ft³), two 50 lb bags for a 3 in post in a 9 in x 30 in hole, depth 1/3 of overall post height, 4 hours before strain, and the safety warning: Quikrete Fast-Setting Concrete Mix data sheet No. 1004-50, revised November 2025, checked 2026-11-03.
- Exterior footings at least 12 in below undisturbed ground and protected from frost: ICC, 2021 International Residential Code, R403.1.4 Minimum depth (codes.iccsafe.org), checked 2026-11-03.
Understanding the result
Each hole is a round cylinder. The concrete is the volume of that cylinder, from the top of the gravel up to the top of the concrete, minus the square post that stands in it. Multiply by the number of holes, add the spare, and divide by the yield of one bag. The result is rounded up to whole bags. The gravel is the cylinder under the post. The drawing shows one hole to scale.
Assumptions this tool makes
- Every hole is a straight-sided cylinder of the same size.
- The post stands on the gravel and the concrete fills the rest of the hole to the height you set.
- A bag makes the volume of wet concrete printed on the bag.
Limitations
- This estimates materials only. It is not a structural design and does not check soil, loads, wind, slope, local codes or frost rules. Whether a footing is big or deep enough is for your building department, the post or kit maker's instructions or an engineer to decide.
- Wet concrete is caustic. Quikrete's data sheet warns that its mix causes severe skin burns and serious eye damage and that breathing the dust over time may cause lung damage; it says to wear impervious gloves such as nitrile, a mask and eye protection. Read the bag and its safety data sheet.
- One hole size per calculation. If your fence and your deck use different holes, run the tool once for each and add the bag counts.
- Round holes only. Square or belled footings, concrete tubes with flared bases and slabs are not modelled.
- Real holes are rarely perfect cylinders, so keep the spare. Wet mixes and uneven sides change how many bags you use.
FAQ
How many bags of concrete do I need per post?
It depends on the hole and the bag. A 10 in wide hole, 32 in of concrete and a 4x4 post needs about 1.2 ft³, which is about 2.7 bags of 60 lb mix. The tool does this for every hole and rounds up the total.
How deep should a fence post hole be?
Quikrete's own guides do not agree on one figure: its setting-posts page says 1/3 to 1/2 of the post length above ground plus 6 in for gravel, and its fast-setting data sheet says 1/3 of the overall post length. For an 8 ft post with 6 ft above ground that is roughly 30 to 42 in. Frost depth, soil and local rules can call for a deeper hole, so ask your building department before you dig.
How far up the hole does the concrete go?
Quikrete's guides fill the concrete to 3 to 4 in below the ground and finish the top with soil or sod. Type that gap in Concrete stops below ground level by, and the tool leaves it out of the concrete.
Can I use this for Postcrete or another rapid-set post mix?
Yes, if you choose a custom bag and type the yield printed on that product. Do not assume a rapid-set post mix makes the same volume per bag as the concrete presets here.
When can I attach rails or a gate?
Follow your bag. For its fast-setting mix Quikrete says it sets in 20 to 40 minutes and to wait 4 hours before the post takes any strain; cold weather slows it down. Other mixes list their own times.
How deep must a deck or gazebo footing be?
That is a building code question, not a concrete-count one. The International Residential Code puts exterior footings at least 12 in below undisturbed ground and protected from frost, for example by reaching below the frost line set locally, and deck footings have their own section (R507.3). Your local building department sets the frost depth and may ask for a permit, so ask it before you dig.